Protective coating (paint/mortar)
Introduction
This annex includes a compilation of terms related to architectural elements and the corresponding construction work necessary for their execution using various materials.
Previous works
Includes preliminary construction site preparation tasks:.
• - Clearing) of vegetation and cleaning of the land.
• - Demolition of pre-existing buildings and clearing debris.
• - Earthworks: excavation, filling, grading").
• - Land transportation: evacuation of surpluses or loan contributions.
Structural system
Foundations and earth containment
Construction support and support on the ground.
• - Foundation: Execution of footings "Footing (foundation)"), piles "Pilot (foundation)"), slabs, wells, braced beams).
• - Retaining walls: Retaining structure, diaphragm wall "Screen (retaining structure)"), sheet piling, prefabricated concrete panel diaphragm, pile diaphragm, wall made of bataches).
• - Sanitary slabs or slabs").
Structure
Subsystem that provides [[|Mechanical balance|stability]] and resistance:.
• - Structural elements: pillars, walls, beams, slabs, lattices "Lattice (engineering)").
• - Materials for structures: reinforced concrete, steel, wood, textiles.
• - Auxiliary means: formwork, falsework, scaffolding.
Envelope
Contenido
Materiales genéricos: Materiales para aislamiento de edificios, barrera de vapor.